武汉绿地缤纷城规划设计施工图纸-20190505.pdf
《武汉绿地缤纷城规划设计施工图纸-20190505.pdf》由会员分享,可在线阅读,更多相关《武汉绿地缤纷城规划设计施工图纸-20190505.pdf(53页珍藏版)》请在佰策地产文库上搜索。
1、1.GENERAL CONTRACTOR SHALL VISIT THE SITE,REVIEW THE BUILDING SHELL DRAWINGS AS SUBMITTED BY THE LANDLORD OR STARBUCKS SITE SURVEYOR AND BECOME THOROUGHLY FAMILIAR WITH THE SITE CONDITIONS PRIOR TO BIDDING OR CONSTRUCTION.2.GENERAL CONTRACTOR SHALL CONSULT WITH STARBUCKS CONSTRUCTION MANAGER TO RESO
2、LVE ANY CHANGES,OMISSIONS OR PLAN DISCREPANCIES PRIOR TO BIDDING OR CONSTRUCTION.3.ALL WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH LOCAL,COUNTY,STATE AND FEDERAL CODES AND ORDINANCES.4.GENERAL CONTRACTOR SHALL VERIFY THE LOCATION OF ALL UTILITIES.5.GENERAL CONTRACTOR TO VERIFY ALL DIMENSIONS,I
3、NCLUDING CLEARANCES REQUIRED BY OTHER TRADES AND NOTIFY STARBUCKS CONSTRUCTION MANAGER OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH THE WORK.ALL DIMENSIONS ARE TO THE FACE OF THE FINISHED SURFACE UNLESS NOTED OTHERWISE.ALL DIMENSIONS TO BE TAKEN FROM DESIGNATED DATUM POINT.DO NOT SCALE DRAWINGS.6.G
4、ENERAL CONTRACTOR SHALL PATCH AND REPAIR ALL EXISTING WALLS,FLOORS,CEILINGS,OR OTHER SURFACES IDENTIFIED TO REMAIN THAT MAY BECOME DAMAGED DURING THE COURSE OF THE WORK.7.THE GENERAL CONTRACTOR IS RESPONSIBLE FOR OBTAINING PERMITS FOR FIRE PROTECTION,PLUMBING,MECHANICAL,AND ELECTRICAL SYSTEMS PRIOR
5、TO INSTALLATION OF SUCH SYSTEMS.8.GENERAL CONTRACTOR SHALL RETAIN ONE SET OF THE PLANS TO NOTE AND DOCUMENT ALL CHANGES DURING CONSTRUCTION.THIS SET SHALL BE A PART OF THE GENERAL CONTRACTORS“STORE CLOSE-OUT PACKAGE”AS DESCRIBED IN THE CONSTRUCTION MANAGEMENT AGREEMENT.9.GENERAL CONTRACTOR IS RESPON
6、SIBLE FOR COORDINATING DELIVERY OF MATERIALS FROM STARBUCKS CONTRACTED THIRDPARTY LOGISTICS DISTRIBUTION SERVICES AND VENDOR DIRECT SHIPMENTS.REFER TO CONSTRUCTION MANAGEMENT AGREEMENT FOR METHODS AND LEAD TIMES.10.RESPONSIBILITY FOR SUPPLY AND DELIVERY OF MATERIALS AND EQUIPMENT IS IDENTIFIED IN TH
7、E DRAWING SCHEDULE SHEETS UNDER THE COLUMN LABELED RESPONSIBILITY.11.FOR THE PURPOSE OF THE DOCUMENTS,TO“INSTALL”,SHALL MEAN TO PROVIDE ALL FASTENERS,MISCELLANEOUS HARDWARE,BLOCKING,ELECTRICAL CONNECTIONS,PLUMBING CONNECTIONS,AND OTHER ITEMS REQUIRED FOR A COMPLETE AND OPERATION INSTALLATION,UNLESS
8、OTHERWISE NOTED.12.ALL ITEM SUBSTITUTIONS MUST BE APPROVED BY THE STARBUCKS DESIGN MANAGER.13.REFER TO ITEM CUTSHEETS FOR ADDITIONAL INFORMATION.GENERAL NOTESMAILING ADDRESS:DESIGNMANAGER:CONSTRUCTION MANAGER:STARBUCKS COFFEE COMPANY2401 UTAH AVENUE SOUTHMS STOP:S-SD10SEATTLE,WASHINGTON 98134(206)31
9、8-1575EDIT FOR DESIGN MANAGERSTARBUCKS COFFEE COMPANYEDIT ADDRESSCITY,STATE/PROV POSTAL CODECOUNTRY(XXX)XXX-XXXX PHONE(XXX)XXX-XXXX FAXEDIT FOR CONSTRUCTION MANAGEREDIT ADDRESSSTATE,CITY/PROV POSTAL CODECOUNTRY(XXX)XXX-XXXX PHONE(XXX)XXX-XXXX FAXPROJECT CONTACTSINDEX OF SHEETSROOM SCHEDULEINDOOR SEA
10、TING:XBAR:XSALES:XWORKROOM:XRESTROOM:XTOTAL INTERIOR OCCUPANT LOAD:XTOTAL INTERIOR SEATING:XTOTAL GROSS SQUARE FOOTAGE:XSITE AND OCCUPANCYVICINITY PLANGCGENERAL CONTRACTORLLLANDLORDSBSTARBUCKSWHSTARBUCKS WAREHOUSE(3PL)VDSTARBUCKS VENDOR DIRECTRESPONSIBILITY LEGENDDesign Consultants上海 漢室 室內設計有限公司Shan
11、ghai HAN Interior Design Co.,Ltd.DESIGN DEVELOPMENT ONLY-NOT INTENDED FOR CONSTRUCTION2401 UTAH AVENUE SOUTHSEATTLE,WASHINGTON 98134(206)318-1575SHEET NUMBER:SHEET TITLE:SCALE:AS SHOWNSTORE#:PROJECT#:ISSUE DATE:DESIGN MANAGER:LEED AP:PRODUCTION DESIGNER:CHECKED BYPROJECT NAME:PROJECT ADDRESS:STARBUC
12、KS COFFEE COMPANYARCHITECT OF RECORDRC 2017 STARBUCKS COFFEE COMPANYRTHIS DRAWING IS A DESIGN DEVELOPMENT DOCUMENT.SITE SPECIFIC MODIFICATIONS MADE UNDER THE RESPONSIBLE CHARGE OF THE ARCHITECT AND/OR ENGINEER-OF-RECORD WILL BE REQUIRED PRIOR TO USING THIS DOCUMENT FOR BIDDING,PERMITTING,OR CONSTRUC
13、TION.THESE DRAWINGS AND SPECIFICATIONS ARE CONFIDENTIAL AND SHALL REMAIN THE SOLE PROPERTY OF STARBUCKS CORPORATION,WHICH IS THE OWNER OF THE COPYRIGHT IN THIS WORK.THEY SHALL NOT BE REPRODUCED(IN WHOLE OR IN PART),SHARED WITH THIRD PARTIES OR USED IN ANY MANNER ON OTHER PROJECTS OR EXTENSIONS TO TH
14、IS PROJECT WITHOUT THE PRIOR WRITTEN CONSENT OF STARBUCKS CORPORATION.THESE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO EXPRESS DESIGN INTENT FOR A PROTOTYPICAL STARBUCKS STORE(WHICH IS SUBJECT TO CHANGE AT ANYTIME)AND DO NOT REFLECT ACTUAL SITE CONDITIONS.NEITHER PARTY SHALL HAVE ANY OBLIGATION NOR
15、 LIABILITY TO THE OTHER(EXCEPT STATED ABOVE)UNTIL A WRITTEN AGREEMENT IS FULLY EXECUTED BY BOTH PARTIES.STARBUCKS TEMPLATE VERSION m2017.05.182019/5/5 11:34:06 F:邱邱工工20190485369-001 武武武武武武武85369-001 武武武武武武武 20190505.rvtG-000185369-00105/05/2019武武武武武武武 湖湖湖武武湖武湖湖湖湖湖湖湖湖湖湖湖湖750号 武武绿绿绿绿武绿绿a座4楼武武武武武John W
16、angLeona Chen/HANJohn WangGENERAL INFORMATIONNAMEAREABar Area31 mEntry Vestibule4 mManager Room3 mOutdoor Seating20 mSeating Area168 mStorage3 mWash Room6 mWork Room10 mGRAND TOTAL246 mSHEETSHEET TITLEGENERALG-0001GENERAL INFORMATIONG-0003PRE-APPROVED CONST.MATERIALSG-0010OUTLINE SPECIFICATIONSG-001
17、1OUTLINE SPECIFICATIONSG-0012OUTLINE SPECIFICATIONSG-0013OUTLINE SPECIFICATIONSARCHITECTURALA-0001ARCHITECTURAL INFORMATIONA-1001ARCHITECTURAL SITE PLANA-2001EXTERIOR ELEVATIONSA-2002EXTERIOR ELEVATIONSA-2003EXTERIOR ELEVATIONSA-2004EXTERIOR ELEVATIONSA-2005EXTERIOR ELEVATIONSA-2006EXTERIOR ELEVATIO
18、NSINTERIORSI-1103INTERIOR FLOOR PLAN&DOOR SCHEDULEI-1104PENETRATION PLANI-1105FF AND E PLANI-1106FF AND E SCHEDULESI-1107ACASEWORK PLANI-1107BCASEWORK PLAN DETAILSI-1107CCASEWORK PLAN DETAILSI-1107DCASEWORK PLAN DETAILSI-1108AREFLECTED CEILING PLANI-1108BREFLECTED CEILING DETAILSI-1109FLOOR FINISH P
19、LANI-1111WALL FINISH PLANI-2101INTERIOR ELEVATIONSI-2102INTERIOR ELEVATIONSI-2103INTERIOR ELEVATIONSI-2104INTERIOR ELEVATIONSI-2105INTERIOR ELEVATIONSI-2106INTERIOR ELEVATIONSI-5001DESIGN DETAILSI-5002DESIGN DETAILSI-5003DESIGN DETAILSI-5004DESIGN DETAILSI-5005DESIGN DETAILSI-5006DESIGN DETAILSI-500
20、7DESIGN DETAILSI-5008DESIGN DETAILSI-5009DESIGN DETAILSI-5010DESIGN DETAILSI-5011DESIGN DETAILSI-5012DESIGN DETAILSI-5013DESIGN DETAILSI-5014ARTWORKI-5015INTERIOR 3D VIEWI-6001SCHEDULESI-6002SCHEDULESPLUMBINGP-0001PLUMBING NOTESP-1103PLUMBING WASTE&VENT PLANELECTRICALE-0001ELECTRICAL NOTESE-1101ELEC
21、TRICAL DESIGN PLANE-1104LIGHTING DESIGN PLANRevision ScheduleRevDateByDescription3D View Main EntryGENERAL CONDITIONSPART 1-GENERAL1.1 INDUSTRY STANDARDSA.APPLICABILITY OF STANDARDS:UNLESS THE CONTRACT DOCUMENTS INCLUDE MORE STRINGENT REQUIREMENTS,APPLICABLE CONSTRUCTION INDUSTRY STANDARDS HAVE THE
22、SAME FORCE AND EFFECT AS IF BOUND OR COPIED DIRECTLY INTO THE CONTRACT DOCUMENTS TO THE EXTENT REFERENCED.SUCH STANDARDS ARE MADE A PART OF THE CONTRACT DOCUMENTS BY REFERENCE.B.PUBLICATION DATES:COMPLY WITH STANDARDS IN EFFECT AS OF DATE OF THE CONTRACT DOCUMENTS UNLESS OTHERWISE INDICATED.C.COPIES
23、 OF STANDARDS:EACH ENTITY ENGAGED IN CONSTRUCTION ON PROJECT SHOULD BE FAMILIAR WITH INDUSTRY STANDARDS APPLICABLE TO ITS CONSTRUCTION ACTIVITY.COPIES OF APPLICABLE STANDARDS ARE NOT BOUND WITH THE CONTRACT DOCUMENTS.1.WHERE COPIES OF STANDARDS ARE NEEDED TO PERFORM A REQUIREDCONSTRUCTION ACTIVITY,O
24、BTAIN COPIES DIRECTLY FROM PUBLICATION SOURCE.1.2 ABBREVIATIONS AND ACRONYMSA.INDUSTRY ORGANIZATIONS:WHERE ABBREVIATIONS AND ACRONYMS ARE USED IN SPECIFICATIONS OR OTHER CONTRACT DOCUMENTS,THEY SHALL MEAN THE RECOGNIZED NAME OF THE ENTITIES IN THE FOLLOWING LIST.ACIAMERICAN CONCRETE INSTITUTE AHAAME
25、RICAN HARDBOARD ASSOCIATION AITCAMERICAN INSTITUTE OF TIMBER CONSTRUCTION ANSIAMERICAN NATIONAL STANDARDS INSTITUTE APAAPA-THE ENGINEERED WOOD ASSOCIATION ASHRAEAMERICAN SOCIETY OF HEATING,REFRIGERATING AND AIR-CONDITIONING ENGINEERS ASTMASTM INTERNATIONAL(AMERICAN SOCIETY FOR TESTING AND MATERIALS
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 武汉 绿地 缤纷 规划 设计 施工 图纸 20190505
佰策地产文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。


成都万科金色家园初步设计总说明(56页).doc
烟温感系统的保养.pdf
